Authority approvals – Obtaining authority approvals for fit-out work involves navigating various regulations and obtaining the necessary permits from local authorities. The process ensures that the project complies with safety, health, and building standards. Here are the general steps involved in obtaining approvals




Understanding Regulations
Research Local Codes: Familiarize yourself with local building codes, zoning laws, fire safety regulations, and accessibility standards.
Consult with Experts: Engage with architects, engineers, or consultants who are knowledgeable about local regulations.
Preparing Documentation
- Architectural Drawings: Prepare detailed architectural plans, including floor plans, elevations, sections, and specifications.
- Structural Plans: If structural changes are involved, provide structural engineering drawings and calculations.
MEP Plans: Submit mechanical, electrical, and plumbing plans showing the layout and specifications of the systems. - Fire Safety Plans: Include fire escape routes, alarm systems, sprinkler systems, and other fire safety measures.
- Environmental Impact: In some cases, an environmental impact assessment may be required.
Submitting Applications
- Application Forms: Complete and submit the required application forms to the relevant authorities.
- Supporting Documents: Attach all necessary documentation, such as drawings, specifications, and impact assessments.
- Fees: Pay any applicable application fees.
Review and Approval
- Authority Review: The local authority will review the submitted plans and documents for compliance with regulations.
- Clarifications and Revisions: Authorities may request additional information or modifications to the plans.
- Approval: Once the plans meet all requirements, the authority will issue the necessary permits and approvals.
Inspections
- Pre-Construction Inspection: Some authorities may require an initial inspection before work begins.
- Ongoing Inspections: Periodic inspections during construction to ensure compliance with approved plans.
- Final Inspection: A final inspection upon completion to verify that the work adheres to all regulations and approved plans.
Certification
- Occupancy Certificate: Once the final inspection is passed, an occupancy certificate or completion certificate is issued, allowing the space to be used.
- Special Permits: Depending on the nature of the fit-out, additional permits (e.g., fire safety, health department) may be required.
- Key Authorities Involved
Building and Construction - Authorities: Local building departments or councils.
- Fire Department: For fire safety and evacuation plan approvals.
- Health Department: If the fit-out involves food service areas or healthcare facilities.
- Environmental Agency: For projects with significant environmental impacts.
- Utilities Providers: For electrical, water, and gas connections.


Frequently Asked Questions
We’ve got you covered across an array of sectors. As the pioneers in interior design, we specialize in Retail spaces, Food havens, Entertainment hubs, Educational sector, Healthcare, Office, Villa & Apartments etc.
our fit-out projects typically span 5 weeks onwards for completion. However, the timeline varies based on factors such as project size, intricacy, design elements, procurement, and regulatory processes. Following authority approvals, smaller or intricate projects (above 5000 sqft) are often finalized within 12 to 14 weeks. Rest assured, our team ensures each phase is executed efficiently while maintaining our high standards of quality and precision. Your vision, our timeline.